Titan Power recently played a pivotal role in upgrading the air conditioning systems of one of Arizona 8217 s largest specialty retailers Our team successfully…

Titan Power successfully executed a UPS replacement and start up project for one of Arizona 8217 s largest healthcare facilities This specialized solution ensures uninterrupted…

University of Arizona Uninterruptible Power Supply Titan Power coordinated the delivery rigging and assisted in the electrical installation of an 825kVA Eaton Powerware 9395 Uninterruptible…

University of Arizona Computer Center UPS Installation Titan Power installed a Three Phase 500kVA Uninterruptible Power System to back up power of the University of…

University of Arizona Battery Plant

South Mountain Community College Gamatronic Installation Titan Power replaced the current Powerware 20kVA UPS with a new Gamatronic RM100 wired for 70kVA with n+1 redundancy…

Data Center Design & Build

Titan Power provided project management for the ASU Help Desk call center location in Tempe This included requesting and getting electrical engineering and city permits…

Titan Power built the back up power system for the administrative offices of Hospice of the Valley in Phoenix AZ Titan Power provided comprehensive project…

Titan Power built the back up power system for the newly built administrative offices of Ironwood Cancer Center in Gilbert AZ We provided comprehensive project…

Titan Power was awarded a design build contract for the building foundation backup power and air infrastructure for an 8 000 square foot data center…

Titan Power designed and built a new Data Center in Scottsdale AZ This Data Center included a Parallel 500kVA UPS Systems with A amp B…

Before amp After Pictures 8211 Titan Power provided and installed a new concrete slab and enclosure ATS step down transformer and electrical connections for customer…

Generator

Titan Power provided project management to Cliff Castle Casino located north of Phoenix to install and replace an emergency generator system Titan Power installed three…

Titan Power replaced the existing generator and UPS with all new upgraded equipment A chemical fire suppression system was created and installed and two Computer…

Titan Power provided and electrically wired a new Natural Gas Generator and an Automatic Transfer Switch This furnishes backup power to the existing building s…

Titan Power provided ASU with an 800kW rental generator for back up power during their 6 week Fall 2011 registration period The generator is located…

Titan Power installed an Emergency Power System for the facility that included a 1750kW Generator and two 2 1600 Amp Automatic Transfer Switches This project…

Titan Power provided and installed a Kohler outdoor 155kW Diesel Generator with 400amp ATS switch with nema 3R enclosure Additionally Titan Power installed a Liebert…

Uninterruptible Power Supply

Titan Power successfully executed a UPS replacement and start up project for one of Arizona 8217 s largest healthcare facilities This specialized solution ensures uninterrupted…

University of Arizona Uninterruptible Power Supply Titan Power coordinated the delivery rigging and assisted in the electrical installation of an 825kVA Eaton Powerware 9395 Uninterruptible…

University of Arizona Computer Center UPS Installation Titan Power installed a Three Phase 500kVA Uninterruptible Power System to back up power of the University of…

University of Arizona Battery Plant

South Mountain Community College Gamatronic Installation Titan Power replaced the current Powerware 20kVA UPS with a new Gamatronic RM100 wired for 70kVA with n+1 redundancy…

Pima County UPS 038 PDU Installation Titan Power s scope of work for this project was the design and build of Pima County 8217 s…

Computer Room A/C

Titan Power replaced the existing generator and UPS with all new upgraded equipment A chemical fire suppression system was created and installed and two Computer…

Titan Power was awarded the contract to supply and install an advanced server cooling solution for a major University in California The bid requirements were…

Titan Power removed 2 22 ton CRAC units and their associated condensers and replaced with 2 new 25 ton Stulz CRAC units This project included…

Titan Power was awarded the contract to provide and install 2 two Liebert DS Computer Room Air Conditioning CRAC units on the Data Center floor…

Titan Power built the back up power system for the newly built administrative offices of Ironwood Cancer Center in Gilbert AZ We provided comprehensive project…

Titan Power replaced the existing generator and UPS with all new upgraded equipment A chemical fire suppression system was created and installed and two Computer…

Power Distribution

ASU Starline Track Busway Installation Titan Power furnished and installed Starline Track Busway and ladder rack to distribute power overhead from ASUs Uninterruptible Power Supply…

ASU Polytechnic 8211 Fire Suppression 038 Power Distribution Titan Power provided ASU the design and installation of a clean agent fire suppression system which included…

Titan Power provided project management for the ASU Help Desk call center location in Tempe This included requesting and getting electrical engineering and city permits…

Titan Power built the back up power system for the administrative offices of Hospice of the Valley in Phoenix AZ Titan Power provided comprehensive project…

Titan Power built the back up power system for the newly built administrative offices of Ironwood Cancer Center in Gilbert AZ We provided comprehensive project…

Titan Power replaced the existing generator and UPS with all new upgraded equipment A chemical fire suppression system was created and installed and two Computer…